September 3

OSHA fines Contractor $148K over Electrical Arc Flash in CT. No Safety Program.

Posted by Hugh Hoagland
Filed under Uncategorized | No Comments

Click here to see the story

Basically an electrical contractor ignored NFPA 70E and even the OSHA standards. Did no training and provided no PPE and didn’t de-energize the equipment. OSHA fined them the maximum.

This entry was posted on Thursday, September 3rd, 2009 at 8:10 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

*